Incomplete bridge
Original Caption
"Abandoned construction of the freeway bridge near Pirk on the A 72. The building site was left in this condition at the beginning of the war in 1939. Work was then continued on the arch and finally completed on 2 October 1992, making the entire stretch of the A 72 navigable."