View from the M-Bahn (maglev train) - on the 1.6 kilometer test track from U-Bahn station Gleisdreieck to Kemperplatz - onto construction work in the border strip between the Berlin Wall (foreground) and the inner Eastern wall (background), probably in preparation for the border opening on November 12, 1989.
Riff Raff
Ich kam, sah / und sprühte